2 Installation Guide
This chapter gives a brief overview over the necessary steps to install a Watson modem.
2.1 Preparations
Before going to the installation site, check what you need of the following equipment in addition
to the modem:
AC/DC Power adapter or supply cable (for tabletop or minirack NTU)
DSL cable
Network cable
Monitor cable and terminal
Mounting material
In case your installation requires special DSL cabling or rack mounting, check what you need of
the following tools:
Wire stripping tool appropriate for the cable size.
Crimp tools for connectors
Screwdrivers
2.2 Installation Requirements
Installation of this equipment has to be done by qualified personnel only.
To achieve safety and satisfactory EMC performance, the plug-in LTU has to be inserted into the
subrack. Subrack slots that are not used have to be covered with blanking plates.
The subrack or minirack must be bonded to earth. This is usually achieved by installing the
subrack or minirack into a rack which is connected to the earthing network according to
ETS 300 253.
Additionally, on the subrack an extra earth terminal for connection to the FPE connector
(Functional Protective Earth) is provided.